steel tube 双语例句
全部
1·And galvanizing steel tube also is deadline is used.
而热镀锌钢管也是限期使用。
2·The layers are affixed to a steel tube structural frame.
这些幕墙层被粘在具有结构作用的铁管状框架上。
3·Mooring bollards being fabricated from steel tube and solid bar.
系泊柱正在编造由钢管和固体酒吧。
4·The futuristic steel tube transportation system is called Hyperloop.
这个未来的管道运输系统被称为超回路列车。
5·The article forecasts well applications of steel tube truss structure.
展望管桁结构有着良好的应用前景。
6·Reheating furnace is an important heat device in steel tube production.
再加热炉是钢管生产中主要的加热设备。
7·Stress and metal flow in steel tube during sizing process were analyzed.
分析了定径过程中钢管内金属流动和弹复行为。
8·A steel tubular intersecting joint is one of the main joints in steel tube structures.
钢管相贯节点是钢管结构中最主要的节点形式之一。
9·Using ga stainless steel tube or a copper tube, the flow rate in the tube is turbulent.
使用不锈钢管或使用铜管,管内流速都是紊流。
10·The AFO cylinder features include a stainless steel tube and roller burnished piston rod.
气缸的踝足矫形器功能还包括一个不锈钢管,辊磨光活塞杆。
钢管
1·The Summer House is constructed with plywood skin on a steel tube frame, materials intrinsically in harmony with the looping geometry of the structure.
夏日凉亭以钢管为框架,覆以胶合木板,这两种材料的运用更符合建筑本身所需的环状几何结构。
2·The paper briefly described the design, construction technology and application effect of combined application of small diameter steel tube pile and consolidation grouting with field cases.
以工程实践为例,简述复杂岩溶地基处理中小口径钢管桩与固结灌浆技术联合应用的设计、施工工艺及应用效果。
3·The design principle and realization method of a new kind of radiographic welding seam inspection system for steel tube were introduced.
介绍了一种应用于钢管焊接接头检验的射线透视系统的设计原理与实现方法。
4·Therefore, high building structure construction, segmentation cantilever of the fastener type steel tube scaffold built very common application.
因此,高层建筑结构施工中,分段悬挑搭设的扣件式钢管脚手架应用得非常普遍。
5·The paper introduces CAD system of steel tube cold drawing process which is a software with optimum function developed by Iron & steel General Institute on basis of computer imitation technology.
介绍了北京钢铁研究总院采用计算机仿真技术与计算机辅助设计技术,开发出具有优化功能的钢管冷拔过程CAD系统通用软件。
