impoundment 双语例句
全部
1·Seepage analysis is an important part in initial impoundment analysis.
渗流及渗流量分析是初次蓄水的重要分析内容之一。
2·Xiaowan arch dam is the highest arch dam in impoundment period in China.
小湾拱坝是当前我国已进入蓄水阶段的最高坝。
3·SurfacE watErs comprisE strEam watErs (E. g. rivErs), ocEans, lakE, and impoundmEnt watEr.
地表水包括流动水(例如河流)、海洋、湖泊和水库水。
4·The immersion fields appeared in the either bank of the reservoir after the reservoir impoundment.
阎王鼻子水库蓄水后,在水库两岸出现浸没现象。
5·After the impoundment of Xiaolangdi Reservoir, the water of small coal mines threatened Xin an coal mine.
小浪底水库蓄水后,淹没区内小煤窑充水对新安煤矿形成较大危害。
6·It can fully meet design requirements subject to acceptance of the project and verification of impoundment.
经工程验收及蓄水验证,完全满足设计要求。
7·Absorbed in immediate interests mining out of order are main reasons of water inrush from gob area impoundment.
只顾眼前利益,无序开采,是发生采空区积水透水事故的重要原因。
8·The observation results confirm that the maximum gravity change is still in Xiangxi segment after second impoundment.
观测结果再次证实:三峡水库二次蓄水后,香溪库段仍是重力变化最大的区域。
9·A magnitude-6.3 quake in India in 1967 that killed 200 people was caused by impoundment behind the country's Koyna Dam.
1967年印度发生的那起震级6.3级、致200人死亡的地震就是印度的柯伊呐(Koyna)大坝(拦截的水产生的应力)造成的。
10·The results indicate that: (1) the character of saturation line change has a time lag of the water level of tailings impoundment;
试验结果发现:尾矿堆积坝的浸润线变化存在滞后性;
蓄水
1·A series of issues of environmental engineering geology will be brought about in impoundment of Xiaolangdireservoir that will break the natural balance state in the area.
小浪底水库蓄水后将打破库区原来的自然平衡状态,产生一系列的环境工程地质问题。
2·Xiaowan arch dam is the highest arch dam in impoundment period in China.
小湾拱坝是当前我国已进入蓄水阶段的最高坝。
3·The hydrodynamic and environmental properties are investigated at near dam region in the water impoundment period of Three Gorges Reservoir based on site observation and numerical model.
通过现场观测和数值模拟的方法,对三峡水库近坝区在蓄水初期的水流和水环境特性进行了 分析。
4·Seepage analysis is an important part in initial impoundment analysis.
渗流及渗流量分析是初次蓄水的重要分析内容之一。
