全部
1·Click to rename the selected gantt chart.
单击此处可重命名所选甘特图。
2·Process leads to Hate (and meetings, and Gantt charts)
进程(改变)导致不喜欢(会议或者甘特图)
3·We didn't have a Gantt chart, because we didn't need one.
我们没有绘制甘特图,因为我们并不需要它。
4·The Gantt chart in Part 1 outlined our Phase 1 work packages.
第1部分中的甘特图描述了我们第1阶段的工作任务包。
5·In the schedule control, the main tools are Gantt chart and check list.
在进度控制方面,使用的主要工具是甘特图和核查清单。
6·Gantt charts show the sequence of activities and how long each should take.
甘特图显示活动顺序多久,每个人都应该采用。
7·Gantt chart is an effective tool for planning and controlling project schedule.
甘特图是工程项目进行工期计划和控制的有效工具。
8·Plan the project using tools such as Gantt chart, PERT chart, planning trees, etc.
使用甘特图、PERT图、策划树等工具策划项目。
9·Figure 2: Gantt chart based on dependencies between architecturally significant elements.
图2:基于架构设计中重要元素之间依赖性的甘特图。
10·A modified Gantt chart that schedules capacity by entire department or specific resources.
一种改进的甘特图,它具有能列出全部部门或者是特定的资源的能力。
甘特
1·The advantages of the Gantt chart are its simplicity, ease of preparation and use, and low cost.
甘特图形的优势是其简洁,便于准备和使用,且成本低。
2·The Gantt chart in Part 1 outlined our Phase 1 work packages.
第1部分中的甘特图描述了我们第1阶段的工作任务包。
3·Figure 2: Gantt chart based on dependencies between architecturally significant elements.
图2:基于架构设计中重要元素之间依赖性的甘特图。
4·Click to rename the selected gantt chart.
单击此处可重命名所选甘特图。
5·Gantt chart is an effective tool for planning and controlling project schedule.
甘特图是工程项目进行工期计划和控制的有效工具。
gantt 短语搭配
(1)gantt chart甘特图;线条图